What Is A S.38 Agreement


Before entering into an agreement, the developer must have obtained the building permit, including permission for all reserved questions. The building permit will generally include an indicative ordinance of the roads to be adopted. The Highway Authority (Council) does not have the power to insist that a developer enter into an S38 agreement. However, many developers consider this also the best option, as the adoption process can be long, and if it takes place at the end of a route, the developer is responsible for all maintenance work until the adoption takes place. Please note that due to major projects related to the legal agreement, it is generally not possible to provide copies of these documents electronically. For assistance to Section 38 or CPA agreements, E-Mail-roadagreements@hants.gov.uk copies of the above agreements are managed by LGSS Law (Northamptonshire Highways legal service providers). The submission checklist explains what a developer/advisor must submit for Hampshire County Council to conduct an S38 design review of the developer`s proposals. The portal guides the applicant through the submission and explains what information is needed. The checklist provides more information about the exact information and documents.

A developer may complete the construction of a road and then propose to the Highway Authority in accordance with Section 37 of the Highways Act 1980, but the S38 is more desirable because the Commission does not have the authority to insist that a road meet an authorized standard or that it is then proposed for adoption. However, if an S38 agreement is reached before construction begins, the City Council can ensure that it is built, lit and drained to the appropriate standards. When a proposed construction is proposed to build a new road for residential, industrial or multi-functional transportation, the normal legal possibility of making the road a public road is by an agreement under Section 38 of Highway 1980. As a general rule, we will only process a Section 38 request for agreement when the plan has been established for “full or reserved issues.” If a section 38 is to be built in construction and the road is to be built to acceptable standards, this may differ from roads that must remain under the control or ownership of the developer. Therefore, non-acceptance of roads requires less stringent specifications. Many new country roads are not built to presumptuous standards. Each municipality is different from what it will leave and what it will not tolerate. Once an agreement has been reached in accordance with Section 38, the developer must work under a number of conditions, conditions and deadlines. It is supported by a loan or cash deposit, calculated by the motorway authority, on the basis of the proposed work.

This loan or cash deposit can be used if the developer goes into liquidation or if he otherwise complies with his obligations. Copy contracts can take up to 7 business days to be made available to you from the time payment is received. The agreement provides for a levy covering the costs of the agreement; Project review, preparation of the agreement, inspection of work and routine maintenance of non-essential objects for motorway purposes (converted amounts).

Comments are closed.